GeoResources Journal for Resources, Mining, Tunnelling, Geotechnics, Equipment and Energy
For detailed results feel free to use our search tool.
GeoResources Journal 1-2024
Focus on sustainable planning, construction and operation & Focus on mobility and heat transition
22. April 2024
( 7482 Clicks / 3667 Downloads )
GeoResources Journal 1-2024 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topics:
Focus on sustainable planning, construction and operation
Focus on mobility and heat transition
GeoResources Journal 3-2023
Special Topic: Focus on fairness and skilled workforce.
03. November 2023
( 7468 Clicks / 3591 Downloads )
GeoResources Journal 3-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on fairness and skilled workforce.
GeoResources Journal 2-2023
Special Topic: Focus on raw material security and supply chain
11. July 2023
( 9642 Clicks / 4643 Downloads )
GeoResources Journal 2-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on raw material security and supply chain.
GeoResources Journal 1-2023
Special Topic: Focus on nature and climate
06. April 2023
( 16464 Clicks / 7556 Downloads )
GeoResources Journal 1-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on nature and climate.
GeoResources Journal 4-2022
Special Topic: Focus on Responsibility
23. December 2022
( 14333 Clicks / 6945 Downloads )
We are pleased to present to you the current edition of the English Journal GeoResources.
05.06.2024 - 07.06.2024
Swiss Tunnel Congress 2024
06.06.2024 - 07.06.2024 17:00
The MiningForum 2024 - with final Agenda
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (3429 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.
RAG-Technikchronik - Buch 2: Technikentwicklung im Abbau
27. September 2018 (19666 Clicks)
Als erster Band erschienen in der Buchreihe Dokumentation der technischen Entwicklung bei der RAG ist das Buch 2, das sich mit der „Technikentwicklung im Abbau“ beschäftigt. Die Autoren betrachten die einzelnen Aspekte des Strebbaus an langer Front in flacher und mäßig geneigter Lagerung.
04.06.2024 (179 Clicks)
Herrenknecht - Mega project in China: 17.5-meter TBM "Shanhe" is ready for construction site